Frank144 Frank144 is offline Adding work converted to actual automaticaly Windows 7 32bit Adding work converted to actual automaticaly Office 2013
Novice
Adding work converted to actual automaticaly
 
Join Date: Aug 2016
Posts: 1
Frank144 is on a distinguished road
Exclamation Adding work converted to actual automaticaly

We are currently experiencing some issues with Project 2013. Whenever we create a task and add work in the future (adding the work on a specific day or week), it sometimes generates actual work at the same time. Since changing the actual work has been deactivated through EPM, PMs don’t have access to correct these issues when it occurs.



Is there is a way to prevent the actual time to be generated when adding work on a task?
Reply With Quote
Reply

Tags
actual work, task, work

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Adding work converted to actual automaticaly How to Input Actual Overtime Work caveman Project 13 03-31-2015 05:24 PM
Adding work converted to actual automaticaly Where have all my 'actual work' entries gone? flanjamin Project 3 11-24-2014 03:41 PM
Break Links to Files automaticaly Asinkan PowerPoint 0 11-14-2012 08:15 AM
Actual work in the future joday48 Project 3 07-06-2012 06:00 AM
MS Project able to import actual start and or actual finish date from Excel? mhacker Project 0 04-26-2010 11:29 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 11:32 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft