Smile Hammock Tasks, but Un-hammocked


I am putting together a basic schedule showing several separate projects and their summary task components. The tasks are basically classified by department (architecture, construction, financing, marketing, etc.). Under each of these tasks, there are sub-tasks.

When these subtasks are rolled into the summary task or hammocked, the result is a bunch of overlapping long lines with not a lot of aesthetic meaning. There are several breaks between each subtask as the ball gets passed to another department then returned.

I was wondering if there is a way to have subtasks rollup into a summary task but show all of the breaks without a hammock. The summary task would appear as a split task by consolidating each its subtasks. For example, schematic design of building for 3 Mo, city approval for 12 months, finish design of building for 9 months. This would appear under summary task Architecture as 3 months of work, 12 Mo break, 9 Months of work.

Please let me know if this is possible. Thanks!
Reply With Quote
  #2  
Old 08-03-2016, 07:47 AM
JulieS JulieS is offline Hammock Tasks, but Un-hammocked Windows 7 64bit Hammock Tasks, but Un-hammocked Office 2013
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

My first suggestion is to re-work the organization of your project. I would not use departments as summary tasks, but rather logical project and task break downs. If you create resources (even as basic as department names) you can then filter, group, or highlight tasks assigned to the departments.

Can you post a picture of the project as it is and I may be able to be more helpful.
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Outlook 365 My Tasks: Tasks vs. TodoList--Sort? markg2 Outlook 0 04-17-2016 03:21 AM
Hammock Tasks, but Un-hammocked Hammock tasks pascalbidouille Project 7 07-22-2015 09:32 AM
Hammock task issue SaraJH Project 3 05-15-2014 05:52 AM
Hammock Tasks, but Un-hammocked Use VBA to create Hammock Tasks seanpears99 Project 1 03-08-2013 08:58 AM
Export Excel tasks into Outlook Tasks (2007 Version on both) crazedmom Excel 0 12-29-2011 07:55 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 11:41 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft