Microsoft Office Forums

Go Back   Microsoft Office Forums > >

Closed Thread
 
Thread Tools Display Modes
  #1  
Old 04-10-2016, 04:49 AM
artr_sipos artr_sipos is offline How to open Project  file? Windows 7 64bit How to open Project  file? Office 2010 64bit
Banned
How to open Project  file?
 
Join Date: Apr 2016
Posts: 1
artr_sipos is on a distinguished road
Default How to open Project file?

I created a new project in Project 2010 standard and after several iterations of edits and saving, I tried to open the file and got an error “Project cannot recognize this file format”. I read that if you just keep hit the Save command while working, the file can get bloated and corrupt. I have a lot of time invested in this project file. Is there a way to fix corrupt ms project file?
MS Project 2010, SP1 installed. I repaired both Project and Office 2010 twice each. Yesterday I had Project uninstalled and re-installed. Not sure what to do now.
  #2  
Old 04-10-2016, 10:16 AM
JulieS JulieS is offline How to open Project  file? Windows 7 64bit How to open Project  file? Office 2013
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

You might be able to save it by inserting the corrupt file (without a link) into a new project.

You should also be WAY past SP-1 see:

https://blogs.technet.microsoft.com/...pport/p/msp10/
Closed Thread



Similar Threads
Thread Thread Starter Forum Replies Last Post
How to open Project  file? Error occurred, when I went to open a MS Project schedule. HermannBaumgartner Project 1 10-29-2014 10:58 AM
Vb script to open a password protected project 2003 file virencm Project 1 04-03-2014 08:02 AM
How to open Project  file? Formula to open external file with specific program (like open with) pemartins Excel 16 02-24-2014 11:39 PM
How to open Project  file? excel cannot open the file .xlsx because the file format or file extension is not val teddysika Excel 1 11-22-2012 06:06 AM
How to open Project  file? Microsoft Project 2010 taking up to 10mins to open file from network share. BITS Project 1 06-01-2011 09:37 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 07:21 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft