Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 10-29-2009, 11:48 AM
robocop robocop is offline How to get ride of the '0h' Windows Vista How to get ride of the '0h' Office 2007
Novice
How to get ride of the '0h'
 
Join Date: Oct 2009
Posts: 1
robocop is on a distinguished road
Angry How to get ride of the '0h'

How do you remove and prevent ‘0h’ being added before and after effort in the Resource and Task Usage views? This seems to be throwing off my start dates. Seems the start date and finish dates at times are based off the ‘0h’ rather than the actual effort.

So my task or resource usage looks like this (0h 0h 0h 0h 0h 0h 0h 36 36 36 36 0h 0h 0h 0h)

I tried to highlight it and delete it but it shifts the effort and at time adds more 0h.
Reply With Quote
 



Other Forums: Access Forums

All times are GMT -7. The time now is 01:36 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft