#1
|
|||
|
|||
![]()
Have you considered using the Timeline view?
|
#2
|
|||
|
|||
![]()
Not a huge fan of timeline view in Project 2010...not enough flexibility for formatting. The reason I created another Gantt chart view is so I can have one view with bar styles, font etc. preferrable for pictures in powerpoint presentations, and one view with different styles preferrable for print-outs.
Have you been able to replicate the issue, by creating another Gantt chart view in a new project? ...just using the basic settings: single view, Gantt chart, Entry table, no groups, all tasks? |
#3
|
|||
|
|||
![]()
I created a new table and removed all fields except the ID column. I then shrunk the ID column to zero. I then dragged the Gantt chart image as far left as I could. Below is what I see:
|
#4
|
|||
|
|||
![]()
Yes, but I actually want 2 different Gantt chart views of 1 table for the reasons below... I don't want to have to reformat the Gantt chart everytime I need to output one for a different purpose.
Ignore the fact that I have column widths set to 0. The inability to center the footer in a new view doesn't seem to matter whether I have column widths set to 0 or not. |
![]() |
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
![]() |
DiGug | Word | 3 | 10-02-2014 02:43 PM |
Footer - more then one footer (auto fill text in slides) | noodle | PowerPoint | 0 | 03-31-2013 04:50 AM |
Presentation view 20% off center | Maxwellmorlay | PowerPoint | 7 | 09-12-2012 01:14 PM |
![]() |
Ulodesk | Word Tables | 1 | 06-08-2012 09:25 PM |
![]() |
Jamal NUMAN | Word | 1 | 04-17-2011 03:31 PM |