#1
|
|||
|
|||
![]() I must be missing something obvious - when I go to put a footer into a print-out of a Gantt chart, it shows up on the left, even when I put the footer text in the 'Center' placeholder. See pic... |
#2
|
|||
|
|||
![]()
Does this happen with all files or just one? All views of the file? Do you have any sort of compression (fit to X by X pages) enabled?
|
#3
|
|||
|
|||
![]()
It seems to happen for new views. The default Gantt chart view centers the footer no problem, but when I try to print a custom Gantt chart view (as I did above), it doesn't seem to want to center the footer. The custom view was just a single view, Gantt chart, no grouping, all tasks, with a table of data with 0 column widths (which shouldn't be an issue since 0 column width has no impact on the footers of the default Gantt view). I created another Gantt view, same problem...
|
#4
|
|||
|
|||
![]()
You lost me on the zero column widths. Why set zero column widths?
|
#5
|
|||
|
|||
![]()
So I can print a Gantt chart without the underlying table showing.
|
#6
|
|||
|
|||
![]()
It doesn't seem to matter though. I created a new project, created a new Gantt view with single view, default Entry table, no groups, all tasks...same thing.
|
#7
|
|||
|
|||
![]()
No ID field? If I create a new table, remove all fields except the ID field and unlock that field - it still work with the centering.
|
#8
|
|||
|
|||
![]()
Have you considered using the Timeline view?
|
#9
|
|||
|
|||
![]()
Not a huge fan of timeline view in Project 2010...not enough flexibility for formatting. The reason I created another Gantt chart view is so I can have one view with bar styles, font etc. preferrable for pictures in powerpoint presentations, and one view with different styles preferrable for print-outs.
Have you been able to replicate the issue, by creating another Gantt chart view in a new project? ...just using the basic settings: single view, Gantt chart, Entry table, no groups, all tasks? |
#10
|
|||
|
|||
![]()
I created a new table and removed all fields except the ID column. I then shrunk the ID column to zero. I then dragged the Gantt chart image as far left as I could. Below is what I see:
|
#11
|
|||
|
|||
![]()
Yes, but my problem isn't with the table that's being used. It's with the view. Create a new Gantt chart view and see what happens.
|
#12
|
|||
|
|||
![]()
The table is part of the view. Do not use the default Entry table. Create a new table, apply it to the existing Gantt chart view. The table is the columnar data you are trying to set to zero.
|
#13
|
|||
|
|||
![]()
Yes, but I actually want 2 different Gantt chart views of 1 table for the reasons below... I don't want to have to reformat the Gantt chart everytime I need to output one for a different purpose.
Ignore the fact that I have column widths set to 0. The inability to center the footer in a new view doesn't seem to matter whether I have column widths set to 0 or not. |
#14
|
|||
|
|||
![]()
I think we are talking past one another here. You can create the new table and apply it to a new Gantt chart view. Obviously with the table columns set to zero width - the custom view won't be useful for much other than printing.
|
#15
|
|||
|
|||
![]()
Ok, let's start over...I'm a little confused...and let's just ignore the fact I'm trying to print a Gantt chart without any tabular data showing on the left.
Let's say I have one table (the default Entry table) that I've populated with all of the data I have for the tasks in my project. Now, I want to view that data two different ways - I want a Gantt chart where all the bars are blue, and I want a Gantt chart where all the bars are red, and I don't want to reformat the default Gantt chart bar styles everytime I need to output a Gantt chart with blue or red bars. To save myself time, I create a new view of the Entry table called Gantt Chart 2. In that new view I set all the bar styles to red. Now, simply by changing views of the Entry table data (just like switching from Gantt Chart to Calendar to Task Sheet to whatever), I can see a Gantt chart with blue bars, or I can see a Gantt chart with red bars, and I can print either of those Gantt charts depending on what my manager's favourite colour of the day is. Except when I go to print the Gantt Chart 2 view I created, I can't center the footer at the bottom of the page. Are we envisioning the same problem? |
![]() |
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
![]() |
DiGug | Word | 3 | 10-02-2014 02:43 PM |
Footer - more then one footer (auto fill text in slides) | noodle | PowerPoint | 0 | 03-31-2013 04:50 AM |
Presentation view 20% off center | Maxwellmorlay | PowerPoint | 7 | 09-12-2012 01:14 PM |
![]() |
Ulodesk | Word Tables | 1 | 06-08-2012 09:25 PM |
![]() |
Jamal NUMAN | Word | 1 | 04-17-2011 03:31 PM |