Resource allocation with two overlapping tasks
 
Join Date: Mar 2014
Location: Texas
Posts: 1
JBlack2275 is on a distinguished road
Default Resource allocation with two overlapping tasks

I've searched all over for my an answer to this, and either it's not possible, or I've just not found the right answer to it.

I'm running two concurrent tasks in Project 2013.

Task 1 runs for 4 weeks
Task 2 runs for 3 days

I have two resources that will be 100% allocated to Task 1, except for the 3 days that they will also be allocated to Task 2, so a 50/50 split.
If I put the resources on Task 2 as 50%, they are shown over utilized for those three days where they are on both tasks simultaneously. (100% task 1, 50% task two)
If I change their percentage to 50% for Task 1 to resolve this, project then shows the resources only at 100% for the 3 days that they are assigned both tasks concurrently, and then only at 50% on Task 1 the rest of the time.

I'm sure there has to be a way that project can be set where I can show the three days that the resources are on both projects that they are 50/50 between each, and the other days they are 100% on Task 1.



Unfortunately I'm pretty new to project, so I can't seem to figure this out for the life of me, any help is greatly appreciated.
Reply With Quote
  #2  
Old 03-03-2014, 05:16 AM
JulieS JulieS is offline Resource allocation with two overlapping tasks Windows 7 64bit Resource allocation with two overlapping tasks Office 2013
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

Answered at:
http://answers.microsoft.com/en-us/o...e-24a4e5b95b7a
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Resource Allocation by weeks Treavis Project 1 02-13-2014 03:33 AM
Resource allocation with two overlapping tasks Resource Allocation OTPM Project 7 10-05-2012 03:40 AM
Resource allocation with two overlapping tasks Allocation of resource Tray Project 3 06-01-2012 03:09 AM
Resource allocation with two overlapping tasks Change resource allocation and have it update everywhere TheJuke Project 3 09-01-2011 02:25 AM
Locking resource for over-allocation resolution lawrencehare Project 1 06-01-2011 03:25 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 12:04 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft