Old 11-12-2013, 03:25 AM
Tedzer Tedzer is offline Multiple resources Windows 8 Multiple resources Office 2013
Novice
Multiple resources
 
Join Date: Nov 2013
Posts: 1
Tedzer is on a distinguished road
Default Multiple resources

Hello,
I have some resources (humans/work) that I have several of them.
For example, I have 3 Engineers. I'd like to be able to add a new resource and call it Engineer, but I'd like to also tell MS Project that I have 3 Engineers instead of creating 3 separate resources called Engineer 1, Engineer 2 and Engineer 3. The reason is, I do have some other resources that are a lot (like 35 persons). Is it do-able?
Reply With Quote
  #2  
Old 11-12-2013, 08:02 AM
JulieS JulieS is offline Multiple resources Windows 7 64bit Multiple resources Office 2010 32bit
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

Answered on the TechNet forum:
http://social.technet.microsoft.com/...nal2010general
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Multiple resources Multiple resources allocated when only one was selected Kent2102 Project 3 04-11-2013 03:47 AM
adding multiple resources Katy I Project 3 07-05-2012 02:18 PM
Multiple resources Setting up resources icw Project 2 09-04-2011 03:55 AM
Multiple resources Total Resources 602chrislys Project 1 10-04-2010 09:04 AM
Shared resources ediez Project 0 08-18-2010 12:04 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 01:06 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft