  #1  
Old 07-22-2013, 07:14 AM
Sognamed Sognamed is offline Need totoal cost despite project being in progress Windows 2K Need totoal cost despite project being in progress Office 2010 32bit
Novice
Need totoal cost despite project being in progress
 
Join Date: Jul 2013
Posts: 1
Sognamed is on a distinguished road
Default Need totoal cost despite project being in progress


I'm trying to see the total cost, or more importantly the material cost, associated with each task. I have material and labor associated with my project. When my project had not started and had not progress, I could simply view the Cost field and get accurate information. Now that the project is in progress, if a task is started the Cost field only shows Remaining Cost. Realizing the formula for this field is Actual Cost + Remaining Cost, I don't populate the Actual Cost field as we capture that in or Earned Value tool, so the Cost field is no longer showing what I need. Is there any way to see the original total cost associated with this project? BTW, the baseline was not set initially so I can't revert back to the Baseline Cost field.
Reply With Quote
  #2  
Old 07-23-2013, 06:06 AM
JulieS JulieS is offline Need totoal cost despite project being in progress Windows 7 64bit Need totoal cost despite project being in progress Office 2010 32bit
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

I'm afraid I'm not following.

You are correct the Cost field = Remaining + Actuals.

If you are not supply progress in Project (not recording Actuals) then doesn't the Cost = original cost?
Reply With Quote
Reply

Tags
cost, in-progress, material



Similar Threads
Thread Thread Starter Forum Replies Last Post
Need totoal cost despite project being in progress updating task progress ketanco Project 1 08-16-2012 05:09 AM
How to create a progress bar AfterLife6 Excel 1 07-31-2012 08:43 PM
Which column shows just labor cost? ketanco Project 9 06-20-2012 02:19 PM
How to rename cost column ketanco Project 3 06-15-2012 03:06 PM
Need totoal cost despite project being in progress Update Progress breaks with constraint benwimpory Project 1 03-14-2012 08:44 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 11:55 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft