calebhuzzah calebhuzzah is offline Master Schedule and Multiple Resource Pools Windows 7 64bit Master Schedule and Multiple Resource Pools Office 2010 64bit
Novice
Master Schedule and Multiple Resource Pools
 
Join Date: Jun 2013
Posts: 1
calebhuzzah is on a distinguished road
Default Master Schedule and Multiple Resource Pools


Hello!

I am beginning to make a master schedule and share resources and dont want to do it incorrectly. The way I am doing this is to create an independant resource pool file (resource pool takes precedance) and share this with the individual subprojects. The subprojects are then inserted into a master project schedule which are linked. I can change the subprojects or the master and it is reflected on both. I only alter the resource pool on the resource file. Will I have trouble with this later? Is this setting myself up for file corruption?
Reply With Quote
  #2  
Old 06-23-2013, 10:10 AM
JulieS JulieS is offline Master Schedule and Multiple Resource Pools Windows 7 64bit Master Schedule and Multiple Resource Pools Office 2010 32bit
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

You're actually doing an additional step that is unnecessary. After creating the resource pool file and connecting the share files, open the resource pool and when prompted, select the third option - "Open resource pool read-write and all other sharer files into a new master project file....."
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Is one master template for multiple templates possible? thecreaser Word 1 03-28-2013 06:38 AM
Master Schedule and Multiple Resource Pools Can I lock guidelines/use on multiple Master pages? choy Word 1 08-16-2012 02:52 PM
Word 2010 / Master Index / Multiple Documents bawrites Word 0 08-09-2011 11:02 AM
Need to Create a Resource Driven Schedule gamer83 Project 2 05-24-2011 03:56 AM
2007 merging multiple documents into one master hugheso Word 0 04-02-2009 04:31 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:44 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft