Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #2  
Old 08-24-2012, 04:46 AM
ketanco ketanco is offline s-curve Windows 7 64bit s-curve Office 2007
Expert
 
Join Date: Dec 2011
Posts: 279
ketanco is on a distinguished road
Default

it is easy:
-first make your schedule
-assign costs to your activities either by putting in fixed costs or by resources
-go to task usage tab
-at the right section of the screen you will see some rows
-right click there and make sure you add cumulative cost row
-you will see that the cumulative costs distributed from left to right all the way from the start to the end for each activity (with respect to your project calendar span at the top)
-then all you do is to paste the top row which is the calendar to excel and then paste the cumulative row to the excel exactly under that first row so you have two rows under each other in excel (make sure dates and costs correspond as in ms project)
-then you can make a graph in excel showing an s curve with one axis being the time and the other cost
hope this helps
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
text on a curve janiceams Word 1 11-18-2009 04:25 AM
Curve the Text Box in a Newsletter? lewiedude Publisher 2 11-08-2005 08:52 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 07:47 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft