Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-09-2012, 09:49 AM
cryoffalcon cryoffalcon is offline Collapseable summary tabs are not seperatable project 2010 Windows 7 32bit Collapseable summary tabs are not seperatable project 2010 Office 2007
Novice
Collapseable summary tabs are not seperatable project 2010
 
Join Date: May 2012
Posts: 4
cryoffalcon is on a distinguished road
Default Collapseable summary tabs are not seperatable project 2010

Hi,
I am using project for one of my work at Ministry, I am not very much familiar with this project software so I came up with an issue.



The issue is that I have created two collapsible summary tabs, I want both of them to work separately, e-g if I collapse one summary tab, the other one should remain open but the issue that I am facing is, that when I collapse the top most tab it collapses everything.

So can someone tell me how to do this, I want both of the summary tabs to work separately and one more thing that I noticed the lower summary tab's days are somehow connected to top most summary tab, while I want both of them to be independent.
Reply With Quote
 

Tags
project 2010



Similar Threads
Thread Thread Starter Forum Replies Last Post
Collapseable summary tabs are not seperatable project 2010 Help with MS Project 2010 MikeJ Project 1 01-27-2012 07:36 AM
project summary ketanco Project 1 01-02-2012 02:35 PM
Collapseable summary tabs are not seperatable project 2010 summary task calculating from project start ketanco Project 1 01-02-2012 02:34 PM
Collapseable summary tabs are not seperatable project 2010 Tabs in MS Word 2010 templates ibsfsg Word 2 12-15-2011 04:54 AM
New/Custom Tabs in Excel 2010 judicial85 Excel 1 09-27-2011 07:59 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 10:37 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft