Managing equipment and person operating equipment
I have several pieces of equipment some of which work 24/7 with start/stop times, with little interruption for troubleshooting and other pieces of equipment requiring manual operation. I need to track the time spent actually working with the 24/7 equipment (like periodically analyzing data from the equipment). This data analysis time occurs during the runtime of the equipment but does not contribute to the runtime of the equipment, so there is a lot of gaps between actual work of the human resource during the operation of the equipment resource. How do I capture this time? Thank you for your assistance in advance.
|
Tags |
project 2010, resources |
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
how to enter equipment resources | benson.wallace | Project | 5 | 03-15-2023 01:43 PM |
Fonts converting over operating systems | anirae | Office | 1 | 07-12-2011 07:21 PM |
Managing contacts shared between three Users | bigbadger | Outlook | 3 | 10-18-2010 01:05 PM |
how to identify the word files created using Windows or Mac Operating System? | mariaprabudass | Word | 0 | 08-06-2010 05:52 AM |