Old 02-22-2012, 03:08 PM
mati2 mati2 is offline Allocation of task in certain period of time Windows XP Allocation of task in certain period of time Office 2007
Novice
Allocation of task in certain period of time
 
Join Date: Feb 2012
Posts: 1
mati2 is on a distinguished road
Default Allocation of task in certain period of time

Please help me with this task.



Number 1 is track works which is set by date and can't be changed.
Number 2 are installations. This should start a month after start of track works and should last untill the beginning of number 3.
Number 3 is testing. Testing should finish at the end of track works but length of it set manually ( ex. 2, 3, 4 weeks)

I would like it to work like that: I manually set dates for track works( which will be solid for the whole project) and length of testing but length of installations is calculated automatically and put between start of Number 1 +1month and start of Number 3. How to set in MS Project to work like that???
Attached Images
File Type: jpg drawing.JPG (8.4 KB, 8 views)
Reply With Quote
  #2  
Old 02-25-2012, 07:59 AM
JulieS JulieS is offline Allocation of task in certain period of time Windows 7 64bit Allocation of task in certain period of time Office 2010 32bit
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

Installations is a successor to Track works with a Start to Start + 1 month lag.

The finish of Installations is a copy/paste link to the value in the start of Testing. Testing is linked Finish to Finish with Track works.

Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Resources allocation walken Project 0 10-31-2011 04:32 AM
Can't change period when adjusting actual time in Web Access chip_saffire Project 0 10-04-2011 12:05 AM
Sharing "main" calendar - time period issue Oyvind Outlook 0 05-20-2011 03:54 AM
Allocation of task in certain period of time Add a period of time to a referenced "Time" cell? derelyth Excel 4 03-27-2011 04:31 PM
how to make the task starts next day if no time enough today(task can not be split) duraid Project 1 10-25-2010 08:31 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 10:07 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft