ketanco ketanco is offline Meaning of current date vs status date when saving baselines Windows 7 64bit Meaning of current date vs status date when saving baselines Office 2007
Expert
Meaning of current date vs status date when saving baselines
 
Join Date: Dec 2011
Posts: 279
ketanco is on a distinguished road
Default Meaning of current date vs status date when saving baselines

Hello,

After I scheduled a project beginning of this january, which was supposed to start at that time, nothing happened on the job and I also did not update my schedule either. I also had not saved any baseline at that time.

Now it is a month later and the job is starting and I was told to save a baseline showing our original plan start dates of beginning of january, like in the original schedule I made. But of course when I reopened my project file right now, it is showing the current date of beginning of february, and no status date as I did not assign any before. Now when I want to save a baseline with the january start dates, do I need to make the current date back to beginning of january? Or the current date can stay as today, beginning of february, because the status date is still showing n/a anyway and when I save the original baseline it will still save everything with the data I made a month ago? Because right now the only change in the entire file is the current date, I have not made any changes at all yet. So when I save baseline it will save the original dates of january start correct?



And then I was told to save a 2nd baseline, which should reflect the start date of actual condition, which is today. So to do that, after saving basline1, I will first make the status date today, and schedule all activities not started to start after status date, and then I will need to save baseline 1 correct?

Thanks
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
updating status date and actual duration ketanco Project 5 01-27-2012 07:32 AM
Meaning of current date vs status date when saving baselines How to insert current date into default filename ? czomberzdaniela Word 1 12-27-2011 07:18 PM
Meaning of current date vs status date when saving baselines MS Project Start Dates not matching the Status Date sjodom Project 3 12-04-2011 08:45 AM
Meaning of current date vs status date when saving baselines How to call current PC date and/or current PC year KIM SOLIS Excel 2 11-04-2011 06:09 PM
new appointment date always reverts back to today's date msills Outlook 0 08-24-2007 08:57 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 04:18 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft