Old 12-24-2011, 12:21 AM
ketanco ketanco is offline entering lump sum costs Windows 7 64bit entering lump sum costs Office 2007
Expert
entering lump sum costs
 
Join Date: Dec 2011
Posts: 279
ketanco is on a distinguished road
Default entering lump sum costs

i have a detailed schedule now and i want to enter lump sum amounts for each activity. what is the best way / practice? should i just enter them to the fixed cost column?
Reply With Quote
  #2  
Old 12-24-2011, 12:56 PM
JulieS JulieS is offline entering lump sum costs Windows 7 64bit entering lump sum costs Office 2010 32bit
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

I would use the Fixed Cost column if you do not need detailed information about what the cost break down is.

If you need detailed information, then create cost resources and assign the specific costs.
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
entering values for a cost type resource ketanco Project 3 12-26-2011 09:25 AM
entering lump sum costs entering future dates for a project that has started ketanco Project 5 12-15-2011 07:16 PM
entering lump sum costs Excel not entering numbers correctly weety Excel 2 06-29-2011 01:07 AM
Entering a postal bar code Sistafatti Word 0 07-14-2010 02:58 PM
Entering Contact details GemmaD Outlook 0 12-18-2008 06:41 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:38 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft