#1
|
||||
|
||||
Hyperlinks in tasks work differently
I like to put hyperlinks to folders and documents in Outlook tasks. When the task pops up, I can click on the link to open the document or a folder containing the information I need to complete that task. This is very useful, but it doesn't always work and I can't figure out why.
As far as I can tell, I always use the same procedure. I create the hyperlinks by dragging the file or folder from a Win Explorer window to the body of the task using the right mouse button. I get a pop-up offering me several choices (move, copy, create hyperlink). I select "Create hyperlink here". This always creates what looks like a valid hyperlink. But the next time the task is opened, the results are different. It could be any one of these three situations:
|
#2
|
||||
|
||||
Good morning, Jennifer. I registered here for the sole purpose of providing assistance to you.
Before we start here, please be advised that I have done nothing regarding the message rule anomaly you reported at PCHF. Please confirm this setting is intact. http://www.msoutlook.info/question/131 |
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Auto-level resources for parallel tasks with fixed work | cineasta | Project | 5 | 11-21-2013 01:03 PM |
Hyperlinks in an Includetext field do not work. Source and target on SharePoint | witwabbit | Word | 2 | 11-06-2013 01:06 PM |
Work calculated differently for two seemingly identical tasks | SteveD | Project | 0 | 10-12-2011 02:05 PM |
Outlook hyperlinks don't work. | russia5 | Office | 1 | 05-21-2009 02:20 PM |
Hyperlinks dont work | iturnrocks | Outlook | 0 | 11-21-2006 10:19 AM |