Jennifer Murphy Jennifer Murphy is offline Hyperlinks in tasks work differently Windows XP Hyperlinks in tasks work differently Office 2007
Competent Performer
Hyperlinks in tasks work differently
 
Join Date: Aug 2011
Location: Silicon Valley
Posts: 234
Jennifer Murphy is on a distinguished road
Default Hyperlinks in tasks work differently

I like to put hyperlinks to folders and documents in Outlook tasks. When the task pops up, I can click on the link to open the document or a folder containing the information I need to complete that task. This is very useful, but it doesn't always work and I can't figure out why.



As far as I can tell, I always use the same procedure. I create the hyperlinks by dragging the file or folder from a Win Explorer window to the body of the task using the right mouse button. I get a pop-up offering me several choices (move, copy, create hyperlink). I select "Create hyperlink here". This always creates what looks like a valid hyperlink.

But the next time the task is opened, the results are different. It could be any one of these three situations:
  1. The hyperlink works perfectly.
  2. The hyperlink generates a warning message about a possible link, but if I say OK, it works.
  3. The hyperlink is converted to plain text and doesn't work at all.
Can someone explain what is happening and what I can do to get the hyperlinks to work reliably without the warning?
Reply With Quote
  #2  
Old 03-07-2014, 07:54 AM
Antman's Avatar
Antman Antman is offline Hyperlinks in tasks work differently Windows 8 Hyperlinks in tasks work differently Office 2010 64bit
Novice
 
Join Date: Mar 2014
Location: Just left of DC
Posts: 1
Antman is on a distinguished road
Default

Good morning, Jennifer. I registered here for the sole purpose of providing assistance to you.

Before we start here, please be advised that I have done nothing regarding the message rule anomaly you reported at PCHF.

Please confirm this setting is intact.
http://www.msoutlook.info/question/131
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
Hyperlinks in tasks work differently Auto-level resources for parallel tasks with fixed work cineasta Project 5 11-21-2013 01:03 PM
Hyperlinks in an Includetext field do not work. Source and target on SharePoint witwabbit Word 2 11-06-2013 01:06 PM
Work calculated differently for two seemingly identical tasks SteveD Project 0 10-12-2011 02:05 PM
Outlook hyperlinks don't work. russia5 Office 1 05-21-2009 02:20 PM
Hyperlinks dont work iturnrocks Outlook 0 11-21-2006 10:19 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 05:31 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft