Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 07-01-2011, 04:31 AM
tonywatsonmail tonywatsonmail is offline Toggle Merge Field Code Help Please Windows 7 32bit Toggle Merge Field Code Help Please Office 2007
Novice
Toggle Merge Field Code Help Please
 
Join Date: Jun 2011
Posts: 10
tonywatsonmail is on a distinguished road
Red face Toggle Merge Field Code Help Please

Hi Everyone,

I can now get a merge field to can the formate on a date from 01/07/11 to 1 July 2011 by using the toggle merge field and puting in

Code:
  {MERGEFIELD StartDate1 \@ "DD MMMM YYYY"} 
And can get it to add a word after to by doing
Code:
 {MERGEFIELD StartDate1 \f "Goodbye"} 
but i cant get it to do both?

i haver tried
Code:
 {MERGEFIELD StartDate1 \@ "DD MMMM YYYY"StartDate1 \f "Goodbye"} }
but it just does the first bit.



can anyone tell me what im doing wrong?

please help

Tony
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Is there any way of importing Indicators field through code? Prabhakar Project 0 04-07-2011 05:50 AM
Toggle Merge Field Code Help Please confusion with merge and field codes BluRay Mail Merge 5 03-29-2011 01:06 AM
Toggle Merge Field Code Help Please Merge field in header disappearing Medievalguy88 Word 2 01-06-2011 08:19 AM
field code question bordercollie10 Mail Merge 3 10-15-2009 07:55 AM
Mail merge Field Code Manipulation macjnr Mail Merge 0 09-10-2009 11:37 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 01:21 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft