![]() |
#1
|
|||
|
|||
![]()
Hi,
My initial column was number, so 8 2 3 0.5 0.25 etc for hours I estimate tasks of the job will last. then having created start and end times columns, several for each task, they obviously generate hh:mm:ss type results when deducting start time from end time. I create a new column beside the initial numbers of hours per task, and populate it manually so 8 hrs is now 08:00:00, 0.25 is 00:15:00 etc number column added to 48.25 hrs, but this new column , using =C2+C3+C4+C5+C6+C7+C8+C9+C10+C11+C12+C13+C14 adds up to 23:45 Why ? I then use autosum on the first 19 rows and success, include a further 6 and failure, tackle the last few rows and success, do it in three chunks 19, 6 and 14 rows and success for each, its as if autosum bottles out of more than 19 ? One would think the format was corrupt for the 6 rows, but on their own they behave. I have totals of 20:15 07:00:00 and 21:00:00 but adding then these together using a+b+c method I get 00:15:00 so that fails. I could post the file but cant see a way of doing so. I simply want rows as tasks, a column for how long I estimate each task to take, then start and end time cells for the times I start and end each task, and several per task to allow for human breaks ! then a column that subtracts the starts from the ends and adds them up for a total, then beside that a column deducting that from the estimate to give a 'credit' or 'debit' figure so I can see if to panic or relax ! anyone care to create such, sounds simple. DBenz |
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Adding Hours in MS Project with Picture | Hochbau | Project | 6 | 02-17-2017 09:45 AM |
Calculate Time in Hours and Percent | pabyford | Excel | 6 | 12-13-2016 12:29 PM |
Time Function for Tracking Hours | Newto365 | OneNote | 0 | 07-11-2016 09:47 AM |
![]() |
v1rt8v2 | Excel | 7 | 01-12-2016 06:55 PM |
![]() |
jen0dorf | Excel | 4 | 06-20-2014 11:53 PM |