I am trying to cross reference data, and I need the right formula.
I have been tasked with completing a report that compares scheduled departure times of the outgoing loads from my facility with the actual departure times of those loads. I have been doing this manually as each load departs, but I have been trying to find a way to automate the entire process so that I can pull the data at the end of the day and get the report immediately. I have been running into issues with this and would appreciate any help or input. The issue I'm running into is that the schedule is wildly inaccurate at times and the destinations are reoccurring. My company wants to ensure that even if there are extra loads generated for a certain destination that we still meet the last scheduled time for that specific destination. Having this specification has made it difficult to return the results I desire. If this is doable then I think I'm on the right track, I'm just missing a formula or two. I have attached a spreadsheet that shows the steps I have made so far and how close I am to my desired results. I am a VERY inexperienced excel user so please be kind. In fact I have not used excel since I took a class to learn the basics back in high school! I would very much appreciate any help regarding this issue. Thanks in Advance.
Last edited by Pecoflyer; 05-16-2018 at 12:08 AM. Reason: Removed unnecessary part of title |
#2
|
|||
|
|||
I could not desipher, what you exactly wanted, so I made 2 possible solutions. On sheet Shedule, columns for Rep1 take loads sent actually out as base, and are matching them with scheduled loads. Colums for Rep2 take scheduled loads as base, and are matching them with actual loads.
In either of reports, something is left out. To get a report, where all scheduled loads and all actual loads are displayed, and positioned to match, can't be made in same table, and is much more complex to create. Btw, in my solution the actual position of loads in table is moot - the load numbers are calculated based on scheduled/actual time. |
Tags |
cross referencing, formula help, index match |
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Cross reference data from 2 different worksheets | connell.richard@gmail.com | Excel | 0 | 12-06-2016 04:26 AM |
Cross-reference / lookup data from one tab and display on another - How to | lonniepoet | Excel | 0 | 02-24-2016 01:31 PM |
Formulas/Scripts That Cross Reference & Import Data | ekeithjohnson | Excel Programming | 3 | 08-23-2014 11:26 PM |
Reference number and cross reference for equation numbers to match the thesis format | wmac | Word | 1 | 05-14-2013 08:54 PM |
Cross-reference together with Mathtype formula is not working correct | Santa_Clause | Word | 2 | 02-02-2010 04:37 AM |