ellebb85 ellebb85 is offline Allocating lunches into a shift calculation Windows Vista Allocating lunches into a shift calculation Office 2016
Novice
Allocating lunches into a shift calculation
 
Join Date: Jan 2016
Posts: 2
ellebb85 is on a distinguished road
Default Allocating lunches into a shift calculation

Hi,



I am looking for any ideas that could help me do the following.
I have a shift builder which when I input all shifts provides daily/interval service level predictions.

Within that I want to allocate lunch periods to staff but, I need a formula or set up that will look at all shifts and allocates the lunch periods equally throughout the day and within certain set parameters i.e minimum and maximum length worked before lunch can be scheduled.

I have been trying to think of ideas for some time but any ideas or suggestions would be appriciated.



Sent from my SM-N915FY using Tapatalk
Reply With Quote
  #2  
Old 04-12-2016, 03:37 AM
Pecoflyer's Avatar
Pecoflyer Pecoflyer is offline Allocating lunches into a shift calculation Windows 7 64bit Allocating lunches into a shift calculation Office 2010 64bit
Expert
 
Join Date: Nov 2011
Location: Brussels Belgium
Posts: 2,779
Pecoflyer has a brilliant futurePecoflyer has a brilliant futurePecoflyer has a brilliant futurePecoflyer has a brilliant futurePecoflyer has a brilliant futurePecoflyer has a brilliant futurePecoflyer has a brilliant futurePecoflyer has a brilliant futurePecoflyer has a brilliant futurePecoflyer has a brilliant futurePecoflyer has a brilliant future
Default

Hi
please post a small sample sheet ( no pics please) showing what you have and desired results ( calculated manually eventually)
__________________
Did you know you can thank someone who helped you? Click on the tiny scale in the right upper hand corner of your helper's post
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
Allocating lunches into a shift calculation Allocating resources based on efficiency PDX-ADM-TRM01 Project 1 12-13-2014 02:39 PM
Allocating lunches into a shift calculation Best practice when allocating a period of time to a number of tasks jgregs Project 3 07-25-2014 10:43 AM
Allocating lunches into a shift calculation Allocating multiple resources to a task and splitting the hours pptdgc Project 1 07-22-2014 03:45 AM
Allocating lunches into a shift calculation Noob here - I need a shift calendar by days with count of shift. freeman Excel 8 09-12-2012 08:45 AM
Allocating lunches into a shift calculation Shift key erratic Razz Outlook 2 05-04-2011 05:35 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 03:45 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft