Good afternoon,

So I'm trying to make a weekly calendar where departments can reserve a building. This is what I've gotten so far:
https://www.dropbox.com/s/uohjhmi2a0...Hall.xlsm?dl=0

What I'm trying to figure out:

1. Inside the sheet "Weekly Task Schedule" a box pops up over the area where you input your information. How do i get rid of that?


2. I'm still trying to figure out a way to highlight the boxes once someone inputs their information to prevent someone else coming in behind them and over book. All events take up one hour and drill does two. So for drill it would automatically highlight more blocks to show a two hour time period. Is this possible?

3. How do I track changes on another sheet? So I want to have a tracker on another sheet that will give me a list of each event that got added and by who. Also, could I track a username of who ever saved any changes?

4. I'm not sure why but the data doesn't shift as the dates move down each day. So every new day I open it up I should have a blank day but the data doesn't shift. The dates are in cells B&C8 (merged), D&E8(merged), F&G8(merged), H&I8(merged), J&K8(merged), L&M8(merged), and N&O8(merged). The contents from Cells B&C10-40 will correlate with the date in B&C8, and so on. So when the new date starts they will all shift over.

#4 is probably the most important. The goal is to have this program run itself so i don't have to go into every day and update it. I've been working on this for a while and have posted it numerous places.

Again thank you!
Attached Files
File Type: xlsm Drill Hall.xlsm (55.4 KB, 8 views)
Reply With Quote
  #2  
Old 02-13-2017, 04:58 PM
jeffreybrown jeffreybrown is offline Weekly Calendar- at a loss Windows Vista Weekly Calendar- at a loss Office 2007
Expert
 
Join Date: Apr 2016
Posts: 673
jeffreybrown has a spectacular aura aboutjeffreybrown has a spectacular aura about
Default

Cross Posted
Reply With Quote
  #3  
Old 02-15-2017, 03:50 PM
04herrs 04herrs is offline Weekly Calendar- at a loss Windows XP Weekly Calendar- at a loss Office 2013
Novice
Weekly Calendar- at a loss
 
Join Date: Feb 2017
Posts: 2
04herrs is on a distinguished road
Default

Quote:
Originally Posted by 04herrs View Post
Good afternoon,

So I'm trying to make a weekly calendar where departments can reserve a building. This is what I've gotten so far:
https://www.dropbox.com/s/uohjhmi2a0...Hall.xlsm?dl=0

What I'm trying to figure out:

1. Inside the sheet "Weekly Task Schedule" a box pops up over the area where you input your information. How do i get rid of that?


2. I'm still trying to figure out a way to highlight the boxes once someone inputs their information to prevent someone else coming in behind them and over book. All events take up one hour and drill does two. So for drill it would automatically highlight more blocks to show a two hour time period. Is this possible?

3. How do I track changes on another sheet? So I want to have a tracker on another sheet that will give me a list of each event that got added and by who. Also, could I track a username of who ever saved any changes?

4. I'm not sure why but the data doesn't shift as the dates move down each day. So every new day I open it up I should have a blank day but the data doesn't shift. The dates are in cells B&C8 (merged), D&E8(merged), F&G8(merged), H&I8(merged), J&K8(merged), L&M8(merged), and N&O8(merged). The contents from Cells B&C10-40 will correlate with the date in B&C8, and so on. So when the new date starts they will all shift over.

#4 is probably the most important. The goal is to have this program run itself so i don't have to go into every day and update it. I've been working on this for a while and have posted it numerous places.

Again thank you!
Number 4 has been solved!!!

https://www.mrexcel.com/forum/excel-...ml#post4756745
Reply With Quote
  #4  
Old 02-15-2017, 05:14 PM
NoSparks NoSparks is offline Weekly Calendar- at a loss Windows 7 64bit Weekly Calendar- at a loss Office 2010 64bit
Excel Hobbyist
 
Join Date: Nov 2013
Location: British Columbia, Canada
Posts: 831
NoSparks is just really niceNoSparks is just really niceNoSparks is just really niceNoSparks is just really niceNoSparks is just really nice
Default

@ 04herrs

Please don't quote entire posts, it's not necessary and just clutters up the forum, thanks.

Read this http://www.excelguru.ca/content.php?184 for an understanding regarding cross posting. It makes things easier for everybody when you include links.

#1 situation is from data validation. All the data validations have the check box checked to display an input message.

#3 can be achieved using the worksheet_change event but you'd need to elaborate on the who, what and where aspect of things.

#2 maybe conditional formatting, although I don't know if shifting the day schedules would wipe out the CF or not. Maybe using the worksheet_change event needed here also.
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
Master Project Weekly Summary Issue east3rd Project 3 06-03-2014 02:40 PM
Weekly Calendar- at a loss Need weekly Work log template recommendation Shazamy Excel 2 10-04-2013 10:50 AM
Weekly Calendar Monoceros Project 0 11-05-2010 03:37 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 01:30 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft