Default Rebaseline process and data verification

Hi there,
New to the forum.. and need some help.
We've been rebaselining projects for years and downloading into an excel sheet that captures the data into a graph displaying cumulative original baseline, cumulative % complete, and rebaseline schedule when required.
I didn't write the procedure on baselining, however my team assure me they're the same as the past 2 years but only has the graphs recently showing the re-baseline not looking correct. If you rebaseline a schedule, it should pull through actuals to date. If you have a look at the attachment I have, you will notice the rebaselined schedule drops off in November quite significantly not following the % complete.
I've included the original and rebaseline data and copy of schedule.
I've also included our instructions.
Hopefully someone is able to identify what is going wrong!
Thanks in advance
Attached Files
File Type: xlsx MS Project Forum example.xlsx (109.6 KB, 19 views)
File Type: docx Rebaseline instructions.docx (378.4 KB, 18 views)
File Type: zip Schedule.zip (904.7 KB, 15 views)
Reply With Quote