Changing color of a calendar exception
Hi.
I have a situation where we shut down our work site over the xmas period (19-Dec to 03-Jan). That I have added to my calendar as an exception with no problems. What has however happened now is that the the Client has asked us not to work from 04-Jan to 01-Feb. That I can add to the calendar as an exception as well, however on the Gantt chart is not clear that these are two different exceptions so I would like to change the color of the one exception.
How do I do that in MS Project 2010?
/Møller
|