Quote:
Originally Posted by lonniepoet
I need help with figuring out how to figure revisions past the 3rd one into what to invoice.
|
Cost = Base + RevCost + WBCost + DigCost
Base = 300
For Line 4:
RevCost = Max(K4-3,0)*50
WBCost = Max(E4-K4,0)*25
DigCost = 3.5*H4*G4*F4/144