Thread: [Solved] Schedule Converging
View Single Post
 
Old 05-27-2015, 11:30 AM
NoSparks NoSparks is offline Windows 7 64bit Office 2010 32bit
Excel Hobbyist
 
Join Date: Nov 2013
Location: British Columbia, Canada
Posts: 842
NoSparks is a glorious beacon of lightNoSparks is a glorious beacon of lightNoSparks is a glorious beacon of lightNoSparks is a glorious beacon of lightNoSparks is a glorious beacon of light
Default

You don't show what the desired results on the Master should be for the IT and LOG sheets you've posted.

I've deleted everything on the Master except for the first line.
Alt + F8 brings up the macro dialogue, run the macro.

Hope I have commented the macro enough for you to follow and alter as necessary. Depending on what is actually wanted you may need to alter or add to the sorting and/or filtering.

A couple comments to assist with VBA:
Time and dates.... use time and dates. Not text.
Merged cells.... avoid them like the plague.
Attached Files
File Type: xlsm TRNG SCHEDULE FINAL FORMAT.xlsm (24.7 KB, 13 views)
Reply With Quote