Thread: [Solved] Generic resource????
View Single Post
 
Old 06-06-2014, 12:59 PM
patrickd123 patrickd123 is offline Windows XP Office 2003
Novice
 
Join Date: Dec 2011
Posts: 21
patrickd123 is on a distinguished road
Default Generic resource????

Hi,

I have a case where a task could be done by either of 3 person of my team of 12 persons

I can't assign the 3 of them at 100% to the task because it would block 3 full time ressource for that period when only one is needed.

I cannot assignt the 3 of them at 33% because it would turn out later that one is under assigned and 2 others are over assigned, once I assign the one person I choose.

I think I saw somewhere that the server version allows to define generic resource that later turns into an actual resource being assigned.

But I have the standalone version.

Is there a way to mimic that feature in this version?

Thanks!
Reply With Quote