Hi everyone,

Attached is what i have at present which is using NETWORKDAYS which is not accurate. I have on a second tab the dates that I wish to exclude from the calculation.

Can anyone help me with this calc so that I can exclude the specific dates and still achieve the results in the attached examlpe (example works as it was all standard weekends that where necessary to exclude)