I am using 2003, but if a later version does it better, i can get that.
I want to use this for Plant "shutdowns". We work 12hr shifts, 24/7 for the duration of the shutdown. Our unit of measure is these "shifts".
I have used Project before, but not in as a sophisticated manner as I would like to.
Thanks in advance.
|