Default How to Decrease the Number of Lines in MSP

Hi all,
Currently, I have a schedule with about 8,000 lines. But I am trying to reduce the number of lines and just keep the high level ones, so that the entire number of lines in the high level schedule is 400-500 max.
But, I am struggling with linking the activities together and the predecessors as in my detailed version, all the activities are well defined and they are linked together perfectly. But with this high level one, I DO NOT have most of the activities to link them together and I have to figure out a way to link the high level ones.
Does anybody have any idea how it can be done with the least struggling?