Trying to plot Team breaks in a Graph
I'm trying to plot a graph to track my team login and break activity, Shift Time: Starts at 8:00 PM and Ends the next day at 4:00 AM, with multiple breaks (IN/OUT) during the day. I want to plot a Stacked Bar or Line graph showing the Employees with a duration between IN and OUT shown in Green and the Breaks which is OUT to IN time in Red
|