You should be using multilevel list numbering set up as described in that link. Set your numbering for level 2 (A B C) to restart upon a change in level 1 (Schedule). Currently, your Schedule is not in the list. There is no need for the inpartnum list.
Read the link and redo your numbering attaching each level to a distinct paragraph style.