Tasks cannot be linked
I have several tasks within a WBS.
These tasks have no linked tasks (no predecessors and no successors).
The WBS however is linked to other WBS's (1 predecessor and 1 successor).
I want to link the tasks within the WBS but get the message:
"These tasks can't be linked because they're already linked through another task chain"
Again these task do not have any successors nor predecessors, their WBS does.