Default Dynamic based on answers?

Hi All,


Is there a way to design a re-usable schedule that can change based on the answer to questions e.g.


Have a schedule that can be used to build a house. It's detailed and covers everything from planning permission to adding a garage. However the 2nd house already has planning permission and doesn't need a garage, so remove those sections.


We appear to be re-building schedules all the time which leads to variances in quality. I would like to build a master schedule that is linked to a questionnaire i.e.:


1: Is planning permission required?
2: 2,3 or 4 Bed house?
3: Is a garage required


Take these answers and dynamically change the schedule based on the output of the questionnaire.


Is this possible?


Regards,


Scott