Dynamic based on answers?
Hi All,
Is there a way to design a re-usable schedule that can change based on the answer to questions e.g.
Have a schedule that can be used to build a house. It's detailed and covers everything from planning permission to adding a garage. However the 2nd house already has planning permission and doesn't need a garage, so remove those sections.
We appear to be re-building schedules all the time which leads to variances in quality. I would like to build a master schedule that is linked to a questionnaire i.e.:
1: Is planning permission required?
2: 2,3 or 4 Bed house?
3: Is a garage required
Take these answers and dynamically change the schedule based on the output of the questionnaire.
Is this possible?
Regards,
Scott
|