Hi everyone,
I have a 3 .pptx more or less alike (but not exactly the same) with a lot of same slides used in those 3 .pptx.
My problem: when I change something on one slide in one of the .pptx, I have to go to all 3 .pptx to apply this change on those same slides.
Is it possible to have a Master-Slave setup where I would have all my slides in a Master .pptx and a 3 Slaves .pptx which would just call the slides present in the Master .pptx.
That way, I would only make the changes once in the Master .pptx and those changes would be automatically applied on the 3 Slaves .pptx.
I hope it was clear enough, anyway thanks for any hint