Quote:
Originally Posted by macropod
This is a fairly basic mailmerge, though you should consider changing some of the workbook's headings - timespans really aren't appropriate for that (e.g. you don't want to have to change the mailmerge main document just because someone decides a different timespan is needed).
.
|
Thanks for the reply. However I do not understand what you mean by timespan. Do you mean the workshops times which are indicated on the Excel sheet?