Thread: [Solved] Calculated dates.
View Single Post
 
Old 09-23-2010, 10:15 PM
Ziggy-R Ziggy-R is offline Windows XP Office 2003
Novice
 
Join Date: Sep 2010
Posts: 13
Ziggy-R is on a distinguished road
Cool Calculated dates.

Afternoon, guys.

So, I'm trying to figure out calculated dates, using either fields or macros, doesn't bother me. I've got an autodate for when you use the document, and a macro to calculate the date 7 days from today, which automatically runs upon opening the document. The only problem with that though, is that it inserts the date at the very beginning of the document, which isn't where I want it.

So, my question is, can some either
a) walk me through fields, as I've never used them in my life, or
b) tell me how to alter the macro to insert the date at the section of the document I need it at?

Any help would be greatly appreciated.
Reply With Quote