Is it possible to do this?
Hi,
I'm using the MS Word SW to show an exploded view of large 3D Assembly instead of CAD SW (in this case solidworks) due to the high sub-assembly qty, it's impossible to do this. Using the Word I'm generating a manual Balloons with its arrow and the images taken from the CAD SW, now I'm also showing the Bill of Material of this assembly (Table with all the P/N). now, Because I'm doing it all manually I don't have any synchronization between the Balloon No. to the index No., now think having a mistake in balloon 20/250 and 20 need to be 21, I have to move Manually 230 balloons....:/ Is there any way that I can link between the Text in the balloon to the index No.? |
|