#1
|
|||
|
|||
Control Time Calculaiton depending on whether line is running or not.
I have a schedule that tracks when parts should be off the line.
How can I add another function to my time to allow for gaps in time depending on whether a line is actually running or not. Line 3 will not run on 1st shift but will run on second shift. I have added a simplified spread sheet to provide a better idea of what I am doing. Last edited by rdperry11; 02-24-2015 at 09:52 PM. |
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Help - Run-time error 91 - VBA for inserting and formatting text depending on style | mtrborges | Word VBA | 2 | 02-08-2015 11:35 PM |
How to create a table with a number of line depending a number entered by user | Cellendhyll | Word Tables | 3 | 07-10-2014 05:49 AM |
Newbie has question about running animation for the first time | xsnerg | PowerPoint | 0 | 02-26-2013 11:56 AM |
Highlight one line at a time | billy589 | PowerPoint | 1 | 10-04-2010 02:33 PM |
Set text in edit control on inspector window indicating time Outlook 2007 | saniltalathi | Outlook | 0 | 02-20-2009 08:43 AM |